Pozzo d’Adda (MI), Italy
Via Cascina Cavallasco, 1/i20060 Pozzo d’Adda (MI)
- Administration
- Engineering
- Production
- Technical service
- Sales
We design, manufacture, install and qualify cleanrooms for every industrial sector. Describe the project: surface area, class to hold and the process that will work inside.
Fields marked with an asterisk are for calling you back. All the others are for answering well.
The Italian plant is where cleanrooms are designed and built. The Spanish office follows Spain, Portugal and Latin America.
Phamm Engineering S.r.l.
Via Cascina Cavallasco, 1/iPhamm Engineering España · Registered office
Carrer del Rosselló, 186, 3º, 5ªOperating offices, commercial partners, agencies and collaborators in Europe and North Africa, and the Latin American market followed by the Spanish office. Choose a point on the map, or an entry in the list below, for direct contacts.
Pozzo d’Adda (MI), Italy
Via Cascina Cavallasco, 1/i
Barcelona, Spain
Registered office: Carrer del Rosselló, 186, 3º, 5ª
Milan, Italy
Via Cappucini, 6 — 20122 Milano (MI)
Maynooth, Ireland
Mooneycooley Maynooth
Athens, Greece
Athens, Greece
Rabat, Morocco
138, Rue Hassane Ben EnnouamaneIndustrial groups, pharmaceutical companies, research centres and universities have entrusted Phamm Engineering with their controlled-contamination environments.














Three steps, in one direction only. Like the air inside a cleanroom: it enters turbulent, it leaves laminar.
A sales engineer reads the request and replies with first feasibility indications.
When the dimensions of the space or the building constraints cannot be read from a drawing, a technician comes to measure them on site.
Contamination class, layout, systems, delivery times and supply conditions, in writing.
Two operating offices, two commercial time zones, one technical team.
The questions we receive most often, with the short answer.
Phamm Engineering designs and builds cleanrooms for pharmaceutical, electronics, semiconductors, aerospace, automotive, medical, food, beverage, mechanical and composite fibres. Each solution is customised to the specific regulations of the sector, from ISO 14644-1 to GMP Annex 1.
It depends on how well defined the project is. With surface area, class to hold and process already clear we get to a first quotation; if the dimensions are missing or the pressure cascade still has to be set up, a site survey is needed first. In the reply we always say what is missing to close the number.
We operate as a global contractor: we manage the whole cycle from 3D design to construction, turnkey installation, qualification and scheduled maintenance.
We build cleanrooms from ISO class 1 to ISO 9 (ISO 14644-1 standard), both hardwall and softwall, with dedicated HVAC and HEPA/ULPA filtration systems.
With offices in Pozzo d’Adda (MI) and Barcelona we operate across Europe and North Africa, and from the Spanish office we follow Spain, Portugal and Latin America. Agencies in Ireland and the United Kingdom, Greece and Morocco.
Hardwall cleanrooms use rigid steel or aluminium panels for permanent high-classification installations (ISO 5–7). Softwall cleanrooms use flexible PVC walls, suited to temporary solutions or tight budgets.
Technical cookies keep the site working. Analytics and marketing are off: you switch them on.Cookie PolicyPrivacy Policy