Cleanrooms

A cleanroom protects the product from contamination coming from outside, exogenous, and from that generated by the people working inside it, endogenous. We design, manufacture and install controlled-contamination environments for pharmaceuticals, medical devices, semiconductors, optics, aerospace and food, up to the delivery of the qualification dossier required by the project.

  • Classification to ISO 14644-1 — from ISO 8 to ISO 5 with HEPA filtration, and down to ISO 1 with ULPA where the process requires it: in ISO 5 the limit is 3,520 particles of 0.5 µm per cubic metre
  • Filtration HEPA H14 and ULPA U15 — 99.995 % and 99.9995 % at the MPPS according to EN 1822, with sealed frames and integrity testing of the installed filter
  • Pressure cascade between adjacent zones: typically 10–15 Pa per step, interlocked doors and separate routes for personnel and materials. Differential pressure works together with filtration, airflow and the tightness of the enclosure
  • Documented performance: particle classification according to ISO 14644-1, in-situ tests according to ISO 14644-3 and monitoring according to ISO 14644-2. In the GMP context, qualification path according to Annex 15
Section · two zones Cascade 10–15 Pa per step
On the right the room: fully covering filter ceiling, vertical flow, return from the grated floor. On the left the entrance, with a single filter unit. Air always flows from the cleaner zone towards the less clean one, never the other way round.
  • ISO 1–8Classes built
  • 3,520 part./m³ISO 5 limit at 0.5 µm
  • H14 · U15Filtration classes
  • AuditAudit-ready documents, where required
They chose us

Pharmaceutical, medical, electronics, food, aerospace

Cleanrooms designed, manufactured, installed and qualified by us, in sectors with very different requirements.

  • L’Oréal Paris
  • Fratelli Beretta
  • Bill & Melinda Gates Foundation
  • PharmaJet
  • University of Pisa
  • Fiat Aviazione
  • Solvay
  • Epson
  • Actavis
  • Kolektor
  • PAN Compositi
  • Ansaldo Energia
  • University of Milan
  • Spes Medica
Images

A cleanroom, seen from inside

The surfaces, the joints, the passages, the ceiling: these are the things decided at the design stage and then looked at every day for twenty years.

  • Room ready for delivery: modular suspended ceiling, flush-mounted light fittings and continuous jointless floor
    Room ready for delivery: modular suspended ceiling, flush-mounted light fittings and continuous jointless floor.
  • Workstations with unidirectional-flow hoods above stainless steel benches
    Workstations with unidirectional-flow hoods above stainless steel benches.
  • Continuous resin floor coved up the walls: no corner where sanitisation cannot reach
    Continuous resin floor coved up the walls: no corner where sanitisation cannot reach.
  • Double-leaf stainless steel passage between two zones, with the return grille flush with the floor
    Double-leaf stainless steel passage between two zones, with the return grille flush with the floor.
  • Large room with clad pillars and wall-mounted pass-boxes, so as not to break the perimeter of the classified zone
    Large room with clad pillars and wall-mounted pass-boxes, so as not to break the perimeter of the classified zone.
  • Preparation area with stainless steel trolleys and a double-door autoclave between one class and the next
    Preparation area with stainless steel trolleys and a double-door autoclave between one class and the next.
  • Stainless steel benches and lighting recessed into the suspended ceiling, flush and sealed
    Stainless steel benches and lighting recessed into the suspended ceiling, flush and sealed.
  • The front of an airlock: hinged door for personnel, double-leaf door for materials, floor-level return
    The front of an airlock: hinged door for personnel, double-leaf door for materials, floor-level return.
How we classify air

ISO 14644-1 measures particles,
and applies in every sector

The cross-sector standard that defines air cleanliness by counting particles, without addressing microbiology or drugs. The class is chosen according to the process. A stricter class means greater demands on filtration, airflow and energy: we identify the least restrictive level compatible with the requirements of the process.

  • ISO 83,520,000 part./m3 ≥ 0.5 µm

    Utilities and packaging

    Secondary packaging, controlled warehouses, operations with unexposed product. HEPA filtration and turbulent flow.

    HEPA · Turbulent flow
  • ISO 7352,000 part./m3 ≥ 0.5 µm

    Processing in a controlled environment

    The most common class: assembly, preparations, operations with personnel present. Airflow sized on the real contaminant load.

    HEPA · Airflow on load
  • ISO 635,200 part./m3 ≥ 0.5 µm

    Surroundings of the critical zone

    The room around the critical point: gowning, material entry, component preparation. Pressure cascade towards the less clean zones.

    HEPA · Pressure cascade
  • ISO 53,520 part./m3 ≥ 0.5 µm

    Critical zone

    The point where the product remains exposed: fully covering unidirectional flow and HEPA H14 filtration.

    Unidirectional flow · HEPA H14

From ISO 4 to ISO 1 the limit drops from 352 to 10 particles per cubic metre, counted at ≥ 0.1 µm in the most demanding classes: this is the field of ULPA filtration, the territory of semiconductors and precision optics. Between ISO 8 and ISO 5 there is a factor of a thousand: every step is paid for in airflow, filters and energy. The classes below ISO 5

Filtration

Two families of filters, one measure

  • HEPA H1499.995 % at the MPPS

    From ISO 8 to ISO 5

    Efficiency according to EN 1822, referred to the MPPS, the most penetrating particle size. It is the standard for classes from ISO 8 to ISO 5.

    EN 1822 · MPPS
  • ULPA U15up to 99.9995 % at the MPPS

    Below ISO 5

    For H14 and U15 the efficiency is referred to the MPPS according to EN 1822. Penetration goes from 0.005% to 0.0005%, a tenfold reduction: it is the filtration needed by classes below ISO 5.

    EN 1822 · MPPS
Challenges and solutions

Six decisions that separate a room
that holds from one that only seems to

They are all made at the design stage, and none can be corrected once the system is finished without redoing something. Each one has a number and a standard behind it.

  • The class is not chosen, it is derived

    You start from the product and the process: what stays exposed, for how long, with how many people around. From there comes the class of each zone, and only afterwards the layout. Doing the opposite — drawing the room and then looking for a class for it — is the most common way of paying for air that is not needed.

  • The ceiling: islands or full coverage

    Under a filter island the flow is unidirectional and carries the particulate away; two metres further on it no longer is. If the critical zone is as wide as the room, you need full coverage: it is the difference between a real ISO 5 and an ISO 5 that is only declared under the filter.

  • A system that maintains the class

    The class depends on adequate filtration, airflow sized on the contaminant load, tightness of the enclosure and pressure cascade. Interlocked doors and separate routes complete the system. Differential pressure limits cross-contamination between zones, but on its own it is not enough.

  • Corners are where cleanliness stops

    A sharp corner holds what sanitisation cannot reach. Coved joints between walls, floor and ceiling, smooth non-porous surfaces, panels with flush joints, concealed screws. It is not a finish: it is the difference between a surface that is cleaned and one that is merely dried.

  • Monitoring has two thresholds, not one

    An alert threshold, which calls for attention, and an action threshold, which calls for intervention. Particle, temperature, humidity and differential pressure sensors connected to the BMS, with continuous recording: if the data is not archived, in an audit it never existed.

  • Qualification is a document, not a promise

    Particle classification follows ISO 14644-1. Recovery test, filter integrity, flow uniformity and pressure differentials are verified according to ISO 14644-3; monitoring follows ISO 14644-2. In the GMP context, IQ verifies the installation against the specifications, OQ the operation within the established limits and PQ the performance under process conditions.

The class is not held by a single element, but by a system: adequate filtration, airflow sized on the real contaminant load and not on a tabulated number of air changes, tightness of the enclosure and pressure cascade between adjacent zones, with interlocked doors and separate routes for personnel and materials. Differential pressure prevents cross-contamination between zones; on its own, without filtration and airflow, it is not enough.

The pharmaceutical case

In the manufacture of medicines
ISO classification alone is not enough

The EU GMP (Annex 1) define four grades — A, B, C, D — that combine a particle limit and microbiological control, verified in two states: at rest and in operation.

  • Grade AISO 5 at rest and in operation

    Critical zone

    Aseptic filling and exposure points of the sterile product.

    Filling · Exposure
  • Grade BISO 5 at rest · ISO 7 in operation

    Surroundings of grade A

    The environment that surrounds and protects grade A in aseptic operations: sterile gowning, aseptic entry.

    Gowning · Asepsis
  • Grade CISO 7 at rest · ISO 8 in operation

    Preparations and washing

    Less critical contamination zone: preparation of solutions, washing of components.

    Preparations · Washing
  • Grade DISO 8 at rest · in operation according to risk analysis

    Support zones

    Packaging and operations with progressively less critical contamination.

    Packaging · Support

Qualification, not just acceptance testing. In the GMP context, systems and equipment are qualified according to Annex 15. Validation concerns processes, methods and computerised systems. Qualification is a prerequisite of validation: a process must run on a qualified system.

  1. URSUser Requirements Specification. Defines the detailed requirements of systems, plants and equipment and forms the basis of the project.
  2. DQDesign Qualification. Verifies that the design meets the URS and the applicable GMP requirements.
  3. FAT / SATFactory Acceptance Testing / Site Acceptance Testing. Any tests at the manufacturer and at the installation site, as required for the equipment.
  4. IQInstallation Qualification. Verifies correct installation against the specifications, including the materials, components and calibrations required.
  5. OQOperational Qualification. Verifies correct operation within the established limits.
  6. PQPerformance Qualification. Verifies performance under process conditions, including the worst-case scenarios foreseen in normal production.

The technical tests are the same as in ISO 14644: GMP incorporates it into a broader framework, with microbiology, dual state and documented qualification. We deliver the complete qualification dossier, ready for inspection. The qualification path, step by step

ISO and GMP

ISO classification and GMP requirements

ISO classification describes the concentration of particles in the air. In the manufacture of sterile medicines, the EU GMP add microbiological, organisational and qualification requirements. An ISO class, on its own, does not describe all the requirements of an environment intended for sterile production.

The GMP grade and the ISO class must be referred to the process and to the state of the environment. Grade A corresponds to ISO 5 at rest and in operation; for grades B and C the correspondence changes between the two states. For grade D the limit in operation is defined on the basis of risk analysis.

Same room, two ceilings Laminar on the left, turbulent on the right
  • GMP requirementsSterile process
  • ISO classesParticle control
  • 0.36–0.54 m/sUnidirectional flow velocity
How we work

Six steps, a single point of contact

It is the same path for every cleanroom, from the clean room to the aseptic suite: what is examined changes at every step, who answers does not.

  1. 01

    Analyse

    Process, standards and site constraints: from these come the class and the URS that sets it.

  2. 02

    Design

    Layout, separate flows, pressure cascade and HVAC, verified on BIM and CFD models.

  3. 03

    Manufacture

    Panels, steelwork and control panels in our workshop, with factory acceptance testing (FAT).

  4. 04

    Install

    On-site assembly, systems and monitoring, on-site verification (SAT) and start-up.

  5. 05

    Qualify

    We carry out the tests and deliver audit-ready documentation, where required.

  6. 06

    Support

    Scheduled maintenance, filters and calibration, including on systems from other suppliers.

Reference standards

The regulatory framework we apply

The ISO 14644 series is not a single document: it is a family, and each part answers a different question — how to classify, how often to repeat it, how to test, how to design, how to clean, which separations can be used. Biological control, instead, has its own family: ISO 14698.

  • ISO 14644-1
  • ISO 14644-2
  • ISO 14644-3
  • ISO 14644-4
  • ISO 14644-5
  • ISO 14644-7
  • ISO 14698-1
  • ISO 14698-2
  • EU GMP Annex 1
  • EN 1822 · H13–U17
  • VDI 2083
  • IEST-RP-CC012
Frequently asked questions

What they ask us before signing

The six questions that come up on every site visit, with the answer we would give in person.

What exactly is a cleanroom?

An environment in which the concentration of airborne particles is controlled and declared, together with temperature, humidity and pressure. ISO 14644-1 classifies it by counting particles per cubic metre at a given size: in ISO 5 the limit is 3,520 particles of 0.5 µm, in ISO 8 it is 3,520,000. It serves to protect the product from two different sources: the exogenous one, which arrives from outside with the air and materials, and the endogenous one, which arises inside — the people, the machines, the process itself.

What is the difference between a sterile cleanroom and a clean room?

ISO classification measures airborne particulate. For the manufacture of sterile medicines the GMP requirements also apply, which include microbiological control, grades A–D and documented qualification. The ISO class and the GMP grade must be chosen according to the process and the state of the environment.

Which class does my production need?

It is not chosen: it is derived. You look at what stays exposed, for how long, with how many people around, and whether terminal sterilisation will follow. From there comes the class of each zone — often several classes in the same building, separated by pressure cascades. A room cleaner than the process requires does not improve the product: it increases the air changes per hour, and those are paid for every hour for the whole life of the system.

How long does it take to build?

A modular clean room in ISO 7–8 takes 10–14 weeks from design to qualification. An ISO 5 cleanroom takes 16–24. An aseptic suite in Grade A/B, with isolators or RABS and full documentation, takes between 20 and 30 weeks. The detailed schedule is part of the quote, it does not come afterwards.

What does turnkey include?

Requirements analysis and drafting of the URS, architectural, mechanical and electrical design in one coordinated project, production of the panels and steelwork in our workshop, on-site installation, commissioning, qualification and training of the personnel who will work inside. Then scheduled maintenance and periodic recertification. A single point of contact for everything: we do not coordinate suppliers, we answer for the result.

Modular or masonry?

Modular, in almost all cases. Sandwich panels go up in weeks instead of months, have suitable surfaces and flush joints already, can be modified when the process changes and dismantled if the building changes. Masonry only makes sense where the structure has to carry loads or where building constraints exist: in that case we build the enclosure on site and integrate with it, keeping cleanroom panelling and finishes.

Let’s talk

Tell us about the process, we’ll take care
of the square metres

What is processed, what stays exposed, how many people enter, which machines go inside and what constraints the building has. With these elements the quote is precise from the first pass, built on your process.